31.10.2019
Porto Franco I building is at full height, facade and interior works are in process, first hotel rooms are taking shape. Preparation works for casting of 3rd floor ceiling of II building are in process, concrete works of last slabs are taking place.

Porto Franco I building , Citybox Tallinn hotel building is at full height 
View to I building ,Citybox Tallinn hotel , from Laeva street 
Citybox Tallinn hotel interior design and layout of rooms has been built 
Roomy glass elevators will be moving between floors of Citybox Tallinn hotel, elevator shafts are being built 
Installation of facade elements of Porto Franco I building 
Cooling piping in shaft of I building is in place 
Floor heating piping is being installed in the wide lobby of Citybox Tallinn hotel 
With each passing day, the facade of building I is reaching more close to its final looks 
Concrete casting works of II building have reached to casting of 3. floor intermediate ceilings 
Concrete casting works of II building have reached to casting of 3. floor intermediate ceilings 
II building being constructed. A vegan restaurant will be opened in that exact spot 
Endless quantity of metal… 
Porto Franco III building concrete slabs casting works are taking place 
Supportive wall of bored piles that holds securely three underground floors in depth of 13 meters, is only 16 meters from the sea 
Cross section: 3 undergound floors and 5 above ground floors